Case Studies
Case study: Theater renovation includes VRF
A Chicago college theater renovation opted for heat recovery variable refrigerant flow systems as part of its heating and cooling plan.
Case study: Office space upgrades wireless lighting controls
An MEP firm’s experience upgrading its own office with wireless lighting controls provided insight into the potential benefits and pitfalls of the technology.
Case study: University dorm renovation uses BIM
Language in the university’s scope of work for a dormitory’s renovation required clarity.
Case study: Lab project uses both VDC, BIM
Still in the design phase, this confidential client is using virtual design and construction and building information modeling to execute a lab.
Case study: State-of-the-art health care system
A multidisciplinary commissioning project allowed a health care facility’s electrical equipment to operate as designed and established a platform for all critical information and statuses to be displayed.
Case study: Chiller plant gets an update
A corporate campus reviewed its chiller’s performance data to determine what updates were needed. Metering and instrumentation helped achieve the engineer’s goals.
Case Study: Health care facility design and being code-compliant
It’s vital for consulting engineers to not only identify the applicable codes and standards but also know the building and owner’s needs.
Case study: Hospital HVAC system benefits from IPD
A new and existing hospital building were delivered using IPD.